Locri Photovoltaic
Telde – Las Palmas (Canary Islands)
25 facilities on roofs
Locri Photovoltaic has been producing since 2011.
Of the 25 facilities, 4 are in roofs of public buildings in the municipality of Telde, the remaining are in college facilities.
It has a total installed capacity in 25 covers of 2.41 MW.
It allows the supply of 1,404 families.
3.10 GWh
Annual Gross Production for 2022
1,147 ton CO2
Avoided emissions